Smart Manufacturing of Cement

Smart Manufacturing of Cement

Smart Manufacturing of Cement Project Lead: University of LouisvillePartners: Argos Member % Cost Share: 32%CESMII % Cost Share: 68%Duration: 24 Months Problem Statement Cement manufacturing is energy-intensive (5GJ/t) and comprises a significant portion of the energy...
Production of Zero Defect (ZD) Slabs in Steel Continuous Casting

Production of Zero Defect (ZD) Slabs in Steel Continuous Casting

Production of Zero Defect (ZD) Slabs in Steel Continuous Casting   Project Lead: ArcelorMittal Partners: Purdue University, Missouri University of Science & Technology, Rensselaer Polytechnic Institute Member % Cost Share: 31%CESMII % Cost Share: 69%Duration: 24...
Inferential Modeling for Driving Out Energy Waste

Inferential Modeling for Driving Out Energy Waste

Inferential Modeling for Driving Out Energy Waste Project Lead: ThinkIQPartners: General Mills Member % Cost Share: 36%CESMII % Cost Share: 64%Duration: 12 Months Problem Statement Energy loses are largely invisible on the manufacturing floor. Wasted energy typically...
Smart Connected Workers in Advanced Manufacturing

Smart Connected Workers in Advanced Manufacturing

Smart Connected Workers in Advanced Manufacturing Project Lead: University of California IrvinePartners: Atollogy, The Aerospace Corporation, General Mills, Honeywell, San Diego Supercomputer Center, California State University Northridge Member % Cost Share:...